The Netherlands Enterprise Agency (RVO.nl) requested the Netherlands Commission for Environmental Assessment to conduct a quality review of an Environmental and Social Impact Assessment (ESIA) and related documents for the ecofarm irrigation and organic sugarcane project in the Chemba district, Sofala province in Mozambique.

Rapports consultatifs et autres documents

24 jun 2016: Memorandum

2016-06 Quick Scan EcoFarm Organic Sugarcane Mozambique

12 aug 2016: Memorandum

2016-08 Quick Scan EcoFarm Organic Sugarcane Mozambique

Informations importantes

The project aims to establish, install, operate and maintain an irrigation infrastructure initiative designed to irrigate large-scale sugarcane plantations which will produce organic sugar for the European markets. The sub objectives relating to the project are to:

  • Install, operate and maintain agricultural infrastructure relating to this project 
  • Develop an irrigation system to irrigate 1,130 hectares of organic sugarcane, 250 ha of fodder crops and 100 hectares of food crops during phase 1 
  • Develop an Energy Island 
  • Develop the institutional and technical capacity of the 2 established co-operatives
  • Deliver high quality organic sugarcane to EcoFarm Mill
  • Increase small-scale farmer’s income levels 
  • Drive continuous improvement through the Environment and Social Management Programme

At the request of RVO, the review was carried out in two stages. A ‘quick scan’ done by the NCEA secretariat, leading to some main observations/pointers to be used in internal decision-making procedures, followed by a more detailed review performed by the external expert at a later stage.

Overall, the ESIA report provides a very comprehensive description of relevant information concerning the legal framework, environmental and social baseline, impact assessment and contains some clear management recommendations. Public participation results and the Environmental and Social Management Program have been documented in separate reports.

However, since the first version of the ESIA report in 2014, the project has undergone several changes (e.g. a two phased approach and change of scope/number of hectares). These changes are not reflected in the last version of the ESIA report of April 2016. The reader thus does not get a clear picture on how many hectares each cooperation member will finally receive, and how many of these hectares are meant for irrigated sugarcane and how many for fodder crops. The project description in the ESIA therefore is not reflecting the latest state of affairs.

The NCEA  recommends to provide an update of the ESIA once the exact locations of the works (e.g. lay out of pivots, irrigation canal, roads etc.) are known, including the related footprint and affected population. Also only then a final version of the Livelihood Restoration and Improved Plan can be drafted (current one of 2014).

Regarding the report on Public Participation the NCEA is of the opinion that there is no real evidence of what has been done with the observations made and whether and how they have been incorporated in the final ESIA of April 2016. NCEA suggests to incorporate a summary of the observations made including how these observations were considered.

Finally, the NCEA advises the further elaboration and detailing of the ESMP, including designation of the organisations executing each measure and the necessary budget and budget coverage.

Photo cover: taken from “Final Draft EcoFarm EPDA _ Update 29 July 2013 KWJ (for Client Review)” .

Parties concernées

Membres du groupe de travail

Membre
mr H.J. Lof

Secrétaire technique: ms I.A. Steinhauer

D'autres détails

Commencé: 12 mei 2016
Terminé: 12 aug 2016

Catégories

Food security
Economical aspects
Irrigation
Agriculture
Environmental and Social Impact Assessment (ESIA)

Pays/région/thème: Mozambique

Mise à jour: 02 apr 2019