7163. Scoping advice on Port de Sèmè-Podji in Benin

The Agence Béninoise pour l’Environnement (ABE) requested the NCEA to advise about the scope of the Environmental and Social Impact Assessment (ESIA) for the new deep sea port Sèmè-Podji.

Rapports consultatifs et autres documents

29 jul 2015: Advisory review

Scoping Advice ESIA Seme Podji

31 jul 2015: Other

English Summary ESIA Seme Podji

Informations importantes

A NCEA working group visited Benin in June 2015. The Pétrolin Group was developer of this new deepwater port at Sèmè-Kpodji, Benin. The Benin Environment Agency (ABE) is responsible for overseeing that procedure and for the project’s environmental certification, has asked the Netherlands Commission for Environmental Assessment (NCEA) to advice about the scope of the ESIA report. (Later the same working group adviced about the review once the ESIA report was finished). The port was to be located 10 km east of Cotonou, and to form part of the infrastructure network that connects west African countries to the rest of the world. Recommendations included the environmental and social management, safety management, and the lay-out of port facilities. During its visit, the NCEA working group informally inspected the existing port of Cotonou upon invitation by the port authorities. It also presented the case of Rotterdam port at a seminar about sustainable port development.

Parties concernées

Membres du groupe de travail

Membre
mr F. Jongsma
mr H.R.J. van Maanen
mr J.A. Roelvink
mr W.A.M. Vlemmix

Le président du groupe de travail: mr R. Rabbinge

Secrétaire technique: mr S.G. Nooteboom

D'autres détails

Commencé: 02 apr 2015
Terminé: 31 jul 2015

Catégories

Social Impact Assessment
Infrastructure
Coastal zone management
Environmental management
Safety
Environmental and Social Impact Assessment (ESIA)
Ports

Pays/région/thème: Benin

Mise à jour: 19 mrt 2019