7020. EIA Strengthening MEEATU-I - Burundi

From 2011-2013, the NCEA worked with the Ministry of the Environment (MEEATU) in Burundi to strengthen its capacity for EIA. Focus was on training staff of the Direction of Environment, responsible for scoping and review of EIA, strengthening their skills, streamlining work processes and developing tools to apply EIA.

Rapports consultatifs et autres documents

05 okt 2011: Memorandum

Observations sur le cadre légal de la procédure d’EIE au Burundi

25 mei 2012: Memorandum

Mémorandum sur Exemples des Guides Généraux d'EIE au Burundi

08 aug 2012: Memorandum

EIA review

01 dec 2012: Memorandum

Memo sur des normes et standards environnementaux

18 feb 2014: Memorandum

Rapport Evaluation MEAATU CNEE 2011-2013

Informations importantes

Started: 2011

Process and activities

In as early as January 2009, the Ministry of Environment of Burundi (MEEATU) asked the NCEA to help prepare it for its new, EIA related tasks that would become mandatory once the new EIA Decree was signed. When this was finally the case, by the end of 2010, MEEATU and the NCEA agreed on a 3-year capacity building programme on EIA.

 

Activities and results

The NCEA activities have contributed to EIA becoming more visible as an important governance tool within Burundi's environmental management framework. Activities that were implemented as part of this programme were, among others:

  • A review of the legal framework for EIA and recommendations for improvement;
  • Development of EIA guidelines (together with the national EIA association ABEIE)
  • Training on scoping
  • Integration of scoping as a formal step in the EIA procedure
  • Development of standard ToR for EIA, ready for adaptation by the investor to make them project specific
  • Training on review
  • general coaching and advice

 

Follow-up

An extensive, joint evaluation of the programme, combined with a new mapping of the EIA system in 2013 (the former one being conducted in 2006 in the context of the PAANEEAC programme) revealed additional opportunities for improving Burundi's EIA system. The legal framework requires revision, practice needs to be improved, and transparency, compliance and enforcement need attention. The Minister of Environment expressed his interest to renew the partnership with the NCEA in order to use these opportunities. This has resulted in a new programme, currently on-going: EIA Strengthening MEEATU-II (2014-2016).

 

Other relevant NCEA activities in Burundi

Burundi was also part of the PAANEEAC programme in Central Africa (2008-2013), aimed at strengthening the capacity of national associations for impact assessment professionals. When this ended, a bilateral MoU was signed between the NCEA and Burundi's national association for EIA, the ABEIE (2014-2018).

Moreover, the NCEA assisted Burundi with advice on specific projects, considered for financing by Dutch infrastructure fund ORIO:

Parties concernées

Secrétaire technique: ms G.J. van Boven

D'autres détails

Commencé: 24 nov 2009
Terminé: 18 feb 2014

Pays/région/thème: Burundi