426-i. Quick Scan EIA review of the Lafa and Onyasia (Accra) Drainage Project

The Facility for Infrastructure Development (ORIO) requested the Netherlands Commission for Environmental Assessment (NCEA) to perform a quick scan of the Environmental and Social Impact Assessment (ESIA) report on the Lafa and Onyasia Drainage Project, Ghana. 

Informations importantes

In this project  the (re-)construction of approximately 7.12 kilometers of the Lafa drain, and the reconstruction of 5.18 kilometers of the Onyasia drain are proposed. Both drains fall withing the metropolitan area of the city of Accra. The aim of this quick review was quality assurance. The review was undertaken in co-ordination with the Ghana Environmental Protection Agency.

Parties concernées

Membres du groupe de travail

Membre
ms A.J.M. Beekmans
mr J.J. Kessler

Secrétaire technique: ms B. Schijf

D'autres détails

Commencé: 10 jun 2015
Terminé: 15 jul 2015

Catégories

Infrastructure
Social Impact Assessment
11 environmental assessment

Pays/région/thème: Ghana

Mise à jour: 08 apr 2019